Fibre, towers, site power, ICT, and civil work across Uganda. Some completed jobs stay off this list under NDA.
2024Turnkey survey, trenching, ducting, and joint splicing for a 180 km optical fiber backbone interconnecting Kampala CBD, Kololo, Nakasero, and Bugolobi with 99.99% link availability.
2025Design and erection of a 250kW rooftop PV solar array coupled with a 500kWh lithium-ion battery energy storage system (BESS) for continuous industrial manufacturing.
2023Structured Cat6A copper and multi-mode fiber cabling across 42 branch headquarters, integrated with Cisco SD-WAN routers and dual redundant ISP failover circuits.
2024Reinforced concrete pad foundations, assembly of 45-meter steel lattice guyed towers, aviation light installation, and high-altitude microwave dish alignment across 18 rural tower sites.
2025Deployment of 180+ 4K PTZ thermal IP surveillance cameras over a dedicated optical fiber ring network with centralized video management software (VMS) and automated license plate recognition.
2026High-throughput NVMe enterprise server cluster hosted locally in Kampala, featuring automated cPanel management, dual off-site backup snapshots, and zero-latency BGP routing.
Fibre, towers, site power, or ICT — sales and engineering will walk the scope with you before anyone mobilises.